chargevu
0 of 2 available3.7 kW peakChargePoint

COLUMBIA COUNTY SAWEVT#9&10

700 Sawmill Rd, Bloomsburg, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
700 Sawmill Rd, 17815, Bloomsburg, PA, United States
Access
24 hours daily
Coordinates
41.02813, -76.40378
Last verified
2025-11-11

About this stop

COLUMBIA COUNTY SAWEVT#9&10 is an EV charging station located in Bloomsburg, US. Operated by ChargePoint, it provides 4 kW peak AC charging power and features Type 1 (J1772) connectors. This station is currently operational. Finding EV charging in Bloomsburg can be straightforward with facilities like this one. The station has an unstated number of charging points available.

A 4 kW peak power output means this is a slower AC charger. Expect it to add about 12 to 15 miles of range per hour of charging. This makes it best suited for topping up while you are parked locally for errands or at work, rather than a rapid refuel for long-distance road trips. It offers a consistent charging experience for drivers needing to extend their vehicle's range within the Bloomsburg area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at COLUMBIA COUNTY SAWEVT#9&10.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of COLUMBIA COUNTY SAWEVT#9&10.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB