chargevu
0 of 1 available3.7 kW peakShell Recharge Solutions (BE)

Copepad 55

Copepad 55, Alphen aan den Rijn, NL

1 port · 0.00 jaarabonnement

Ports at this station

  • Type 2

    1× · up to 3.7 kW

    Unknown

Station info

Address
Copepad 55, 2408 RT, Alphen aan den Rijn, Netherlands
Total points
1
Coordinates
52.11611, 4.66027
Last verified
2016-06-04

About this stop

Shell Recharge Solutions operates the Copepad 55 charging station in Alphen Aan Den Rijn, Netherlands. This site has one charging point equipped with a Type 2 socket. The maximum power output is 4 kW, which is a slower AC charging speed. The station is currently reported as operational. There is no annual subscription fee for this charger.

A 4 kW peak charging speed means it will take around 12 to 16 hours to add 100 miles of range to a typical EV. This makes Copepad 55 best suited for local top-ups rather than quick road trip charging. Drivers needing to add significant range will find this station slow. EV charging in Alphen Aan Den Rijn offers various options, and this is one of the slower AC choices available.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Copepad 55.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Copepad 55.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB