CP EV STATION HARVARD AVE 2
1886 Harvard Avenue, Atlanta, US
2 ports
Ports at this station
- Unknown
Type 1 (J1772)
2× · up to 3.7 kW
Station info
- Address
- 1886 Harvard Avenue, 30337, Atlanta, GA, United States
- Access
- 24 hours daily
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 33.65349, -84.45065
- Last verified
- 2025-11-11
About this stop
This ChargePoint station at Harvard Ave 2 in Atlanta offers EV charging. It provides Type 1 (J1772) connectors and is currently operational. The station's peak power output is 4 kW, which is considered slower AC charging.
A 4 kW charging speed means you can add about 12-15 miles of range per hour of charging. This rate is best suited for local trips or overnight top-ups rather than rapid refueling for long-distance journeys. Plan accordingly for your EV charging in Atlanta needs with this slower AC option.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
Wynthrope Forest Apartment Homes
13.7 kmRiverdale
3.7 kW
European Collision Repair-Jonesboro - Tesla Destination
15.5 kmJonesboro
3.7 kW
Walton Fayetteville Apartments
15.7 kmFayetteville
3.7 kW
City of Jonesboro
16.8 kmJonesboro
3.7 kW
Sam Smith Performance Car Care Center
16.9 kmFayetteville
3.7 kW
Wingate by Wyndham Atlanta/Fairburn
17.1 kmFairburn
3.7 kW
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of CP EV STATION HARVARD AVE 2.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB