chargevu
0 of 2 available3.7 kW peakChargePoint

CUPERTINO UNION MONTCLAIRE 2

1991 Scott Ln, Los Altos, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
1991 Scott Ln, 94024, Los Altos, CA, United States
Access
24 hours daily
Coordinates
37.34242, -122.08305
Last verified
2025-11-11

About this stop

The CUPERTINO UNION MONTCLAIRE 2 is a ChargePoint-operated EV charging station located in Los Altos, US. It offers Type 1 (J1772) connectors and is currently reported as operational. The peak power available at this site is 4 kW.

With a peak output of 4 kW, this station provides slower AC charging. This is generally best suited for local use or for drivers who can leave their vehicle plugged in for an extended period, rather than for quick top-ups during long road trips. Expect to add about 10-15 miles of range per hour of charging. EV charging in Los Altos includes options like this for residents and visitors.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at CUPERTINO UNION MONTCLAIRE 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of CUPERTINO UNION MONTCLAIRE 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB