chargevu
2 of 2 available22 kW peakStadtwerke Düsseldorf AG

Cuxhafener Str. 2

Cuxhafener Str. 2, Düsseldorf, DE

2 ports

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available

Station info

Address
Cuxhafener Str. 2, 40221, Düsseldorf, Germany
Coordinates
51.21330, 6.73421
Last verified
2021-07-09

About this stop

This Stadtwerke Düsseldorf AG station at Cuxhafener Str. 2 provides 22 kW AC charging, suitable for drivers needing a slower top-up. It uses Type F connectors, also known as Schuko.

EV charging in Düsseldorf includes options like this station. A 22 kW peak rate means a car with a 60 kWh battery could gain about 22 kWh of charge in an hour. This speed is best for local trips or longer stops, not for rapid refueling on a cross-country journey.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Cuxhafener Str. 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Cuxhafener Str. 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB