Department of Education
Central Business Park, Tullamore, IE
2 ports
Ports at this station
- Available
Type 2
2× · up to 22 kW
Station info
- Address
- Central Business Park, R35 P761, Tullamore, Ireland
- Total points
- 2
- Coordinates
- 53.26085, -7.48609
- Last verified
- 2026-01-14
About this stop
This Monta charging station in Tullamore suits drivers needing a slower AC charge. It offers 22 kW peak power through two Type 2 sockets. Monta operates this site at the Department of Education. This EV charging in Tullamore provides Type 2 connectors. The station is currently reported as operational. Drivers can expect a maximum charging speed of 22 kW AC. This means adding about 75 miles of range per hour, depending on the vehicle. It’s best suited for local top-ups or longer stops rather than quick road trip charges. Plan for charging to take several hours if you need a full battery.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Department of Education.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB