chargevu
0 of 2 available3.7 kW peakChargePoint

DEV EVSP IAD 1R #4

9300 Cargo Dr, Sterling, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
9300 Cargo Dr, 20166, Sterling, VA, United States
Access
24 hours daily
Coordinates
38.95528, -77.45258
Last verified
2025-11-11

About this stop

DEV EVSP IAD 1R #4 is an electric vehicle charging station located in Sterling, US. This ChargePoint network location offers AC charging with a peak power output of 4 kW. It provides Type 1 (J1772) connectors for EV charging in Sterling. The station is currently reported as operational.

A 4 kW peak charging speed means this station is best suited for local top-ups or longer stops, not for quick road-trip charging. To put it in perspective, charging an electric car with a 60 kWh battery from empty to 80% at 4 kW would take approximately 12 hours. This speed is considerably slower than DC fast charging options that can add significant range in under an hour.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at DEV EVSP IAD 1R #4.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of DEV EVSP IAD 1R #4.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB