chargevu
2 of 2 available22 kW peakInnogy SE (RWE eMobility)

Düsseldorferstr. gegenüber 20

Düsseldorferstr. gegenüber 20, Schöppingen, DE

2 ports

Ports at this station

  • Type 2

    1× · up to 22 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Düsseldorferstr. gegenüber 20, 48624, Schöppingen, Germany
Coordinates
51.10148, 7.23517
Last verified
2021-07-09

About this stop

Innogy SE operates this AC charging station at Düsseldorferstr. gegenüber 20 in Schöppingen. It offers EV charging in Schöppingen. The station is currently operational and provides Type 2 connectors with a socket-only setup. The peak power output is 22 kW.

This station is best suited for local charging or longer stops rather than quick road trip top-ups. A 22 kW peak charging rate means that in ideal conditions, it can add approximately 70 miles of range to an EV in one hour. Expect slower charging compared to DC fast chargers typically found along major highways. Check your vehicle's onboard charger capacity as it may be the limiting factor for charging speed.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Düsseldorferstr. gegenüber 20.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Düsseldorferstr. gegenüber 20.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB