chargevu
0 of 1 available3.7 kW peakChargePoint

ECOLOGY ACTION CEDAR STREET 1

877 Cedar St, Santa Cruz, US

1 port

Ports at this station

  • Type 1 (J1772)

    1× · up to 3.7 kW

    Unknown

Station info

Address
877 Cedar St, 95060, Santa Cruz, CA, United States
Access
24 hours daily
Coordinates
36.97406, -122.02811
Last verified
2025-11-11

About this stop

ECOLOGY ACTION CEDAR STREET 1 is an EV charging station located in Santa Cruz, US. It is operated by ChargePoint and offers Type 1 (J1772) connectors. The station is reported as operational. This is one of the options for EV charging in Santa Cruz.

With a peak power of 4 kW, this AC charging station is best suited for local top ups rather than rapid road trip charging. A 4 kW charge rate adds about 12 to 16 miles of range per hour. This means a full charge could take several hours, depending on your vehicle's battery size and its current state of charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at ECOLOGY ACTION CEDAR STREET 1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of ECOLOGY ACTION CEDAR STREET 1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB