Energiedienst
Hauptstraße 27, Herrischried, DE
1 port
Ports at this station
- Available
Schuko (CEE 7/4)
0× · up to 3.7 kW
- Available
Type 2
1× · up to 22 kW
Station info
- Address
- Hauptstraße 27, 79737, Herrischried, Verwaltungsgemeinschaft Bad Säckingen, Germany
- Access
- Rund um die Uhr nutzbar. Freischaltung / Stromkosten müssen mit einer Master oder VISA Kreditkarte mit NFC Funktion paypass/paywave bezahlt werden.
- Total points
- 1
- Coordinates
- 47.66429, 8.00319
- Last verified
- 2015-11-20
About this stop
Naturenergie operates this EV charging station in Herrischried, DE. It offers a single charging point with a peak power of 22 kW. Connectors available are CEE 7/4 (Schuko) and a Type 2 socket. The station is currently operational.
This 22 kW peak power is considered slower AC charging. For context, adding about 15 miles of range per hour is typical. This makes it a good option for local top-ups rather than a quick road trip stop. EV charging in Herrischried is available here for drivers needing a charge. The station provides basic charging functionality.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Energiedienst.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB