chargevu
0 of 2 available3.7 kW peakChargePoint

FRIDLEY CC STATION 1

7071 University Ave NE, Fridley, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
7071 University Ave NE, 55432, Fridley, MN, United States
Access
24 hours daily
Coordinates
45.09610, -93.26161
Last verified
2025-11-11

About this stop

This FRIDLEY CC STATION 1 location is a ChargePoint station in Fridley, US, offering slower AC charging. It has Type 1 (J1772) connectors. The peak power here is 4 kW. This speed is best suited for drivers who can leave their EV plugged in for a few hours, like during work or overnight stays.

EV charging in Fridley at 4 kW peak means you add about 10-15 miles of range per hour. This makes the station a good choice for a local top-up rather than a quick road trip stop. It is currently operational. ChargePoint runs this site, providing accessible charging for electric vehicles in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at FRIDLEY CC STATION 1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of FRIDLEY CC STATION 1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB