chargevu
2 of 2 available22 kW peak(Business Owner at Location)

Gemeindeamt

Beekstraße 2, Erfde, DE

2 ports

Ports at this station

  • Type 2

    2× · up to 22 kW

    Available

Station info

Address
Beekstraße 2, 24803, Erfde, Kropp-Stapelholm, Germany
Access
2 kostenlose Parkplätze vor der durchgehend und ohne Ladekarte nutzbaren Ladesäule.
Total points
2
Coordinates
54.30874, 9.31840
Last verified
2016-08-01

About this stop

In Erfde, Germany, you will find the Gemeindeamt EV charging station. This independent or unlisted site offers two charging points, each equipped with a Type 2 socket. The peak power output is 22 kW, which is considered slower AC charging. The station is currently reported as operational.

This station is best suited for topping up your EV battery while visiting local sites in Erfde rather than for long-distance road trips. A 22 kW peak charging speed typically adds about 70-80 miles of range per hour for compatible EVs. This means a few hours plugged in here could replenish a significant portion of your battery, depending on your vehicle's needs and capabilities.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Gemeindeamt.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Gemeindeamt.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB