chargevu
4 of 4 available22 kW peakRheinEnergie AG

Gemeindeverwaltung

Karlheinz-Stockhausen-Platz 1, Kürten, DE

4 ports

Ports at this station

  • Type 2

    2× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    2× · up to 3 kW

    Available

Station info

Address
Karlheinz-Stockhausen-Platz 1, 51515, Kürten, Rheinisch-Bergischer Kreis, Germany
Access
Ladesäule auf öffentlichem Parkplatz. TankE Karte der RheinEnergie nötig, kann in der Gemeindeverwaltung ausgeliehen werden.
Total points
4
Coordinates
51.05189, 7.26712
Last verified
2016-09-08

About this stop

For drivers needing a slower AC charge, the Gemeindeverwaltung station in Kürten offers 22 kW peak power across four charging points. Operated by RheinEnergie AG, it provides Type 2 (socket only) and standard CEE 7/4 Schuko connectors. This is a practical option for EV charging in Kürten.

At 22 kW peak, expect to add roughly 70-80 miles of range per hour of charging. This speed makes the station best suited for local top-ups or as a charging stop during a longer journey where time is not the primary concern. The station is currently reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Gemeindeverwaltung.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Gemeindeverwaltung.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB