chargevu
2 of 2 available22 kW peakMonta

Government Buildings

Castle Rd, Ballina, IE

2 ports

Ports at this station

  • Type 2

    2× · up to 22 kW

    Available

Station info

Address
Castle Rd, Ballina, Co. Mayo, Ireland
Total points
2
Coordinates
54.11745, -9.15188
Last verified
2025-12-04

About this stop

Two charging points with Type 2 sockets are available at the Government Buildings in Ballina, IE. The network operator is Monta. This station provides 22 kW peak AC charging power.

This is a slower AC charging stop, best suited for topping up while visiting local sites rather than a rapid road-trip refresh. A 22 kW peak charge rate means you might add about 70-80 miles of range per hour, depending on your car. EV charging in Ballina includes this Monta option for local drivers or visitors needing a moderate power boost.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Government Buildings.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Government Buildings.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB