Ports at this station
- Available
Schuko (CEE 7/4)
1× · up to 22 kW
- Available
Type 2
1× · up to 22 kW
- Available
Schuko (CEE 7/4)
1× · up to 22 kW
- Available
Type 2
1× · up to 22 kW
Station info
- Address
- Grüner Weg 100, 52070, Aachen, Germany
- Coordinates
- 50.79440, 6.11041
- Last verified
- 2021-07-12
About this stop
Grüner Weg 100 is an EV charging station located in Aachen, Germany. It is operated by an independent or unlisted network. The station offers a peak power of 22 kW, which is a slower AC charging speed. It provides connectors including CEE 7/4 (Schuko) and Type 2. The station is currently reported as operational. This station is a good option for EV charging in Aachen.
A 22 kW peak charging rate means that a compatible EV could add approximately 13 miles of range per hour of charging. This makes Grüner Weg 100 best suited for local top-ups or for drivers who have ample time to charge. It is not intended for rapid charging on long road trips. Drivers will find both standard household outlets (Schuko) and Type 2 connectors available for use.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Grüner Weg 100.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB