chargevu
0 of 2 available11 kW peakAllego BV

Guldenweg 73

Guldenweg 73, Hendrik-Ido-Ambacht, NL

2 ports · 0.00 jaarabonnement

Ports at this station

  • Type 2

    1× · up to 11 kW

    Unknown
  • Type 2

    1× · up to 11 kW

    Unknown

Station info

Address
Guldenweg 73, 3341 CJ, Hendrik-Ido-Ambacht, Netherlands
Total points
1
Website
allego.eu
Coordinates
51.84617, 4.64840
Last verified
2016-06-04

About this stop

This Allego charging station is located at Guldenweg 73 in Hendrik-Ido-Ambacht, The Netherlands. It offers a single charging point with a Type 2 socket and a peak power output of 11 kW. The station is currently reported as operational. There is no yearly subscription fee required for its use. EV charging in Hendrik-Ido-Ambacht includes this Allego location.

At 11 kW, this AC charger is best suited for local top-ups or longer stops rather than quick road-trip charging. To put 11 kW into perspective, a typical electric car with a 60 kWh battery would take around 5.5 hours to charge from empty to full. This charger will provide about 30-40 miles of range per hour of charging.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Guldenweg 73.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Guldenweg 73.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB