chargevu
4 of 4 available22 kW peakEnBW (D)

Hahnenweilerstr. 2

Hahnenweilerstr. 2, Dornstadt (Tomerdingen), DE

4 ports

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Hahnenweilerstr. 2, 89160, Dornstadt (Tomerdingen), Germany
Coordinates
48.48224, 9.91147
Last verified
2021-07-12

About this stop

This EnBW station at Hahnenweilerstr. 2 in Dornstadt (tomerdingen) offers 22 kW peak AC charging. It provides Type 2 sockets for modern EVs and standard Schuko connectors for older or other vehicles. The exact number of charging points is not specified.

At 22 kW, this is slower AC charging. Expect to add about 15 to 20 miles of range per hour, depending on your car. This speed is best suited for topping up while shopping or running errands locally, rather than rapid replenishment for long-distance travel. It represents typical EV charging in Dornstadt (tomerdingen) for drivers needing a moderate energy boost.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Hahnenweilerstr. 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Hahnenweilerstr. 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB