Ports at this station
- Available
Schuko (CEE 7/4)
1× · up to 22 kW
- Available
Schuko (CEE 7/4)
1× · up to 22 kW
Station info
- Address
- Hauptstraße 10, 88524, Uttenweiler, Germany
- Coordinates
- 48.17793, 9.61183
- Last verified
- 2021-07-09
About this stop
EnBW operates this EV charging station at Hauptstraße 10 in Uttenweiler, Germany. It offers 22 kW peak charging power, which is considered slower AC charging. The station is equipped with CEE 7/4, also known as Schuko or Type F, connectors. The current operational status of the charging points is unknown. This station is a good option for EV charging in Uttenweiler, likely best suited for local top-ups rather than rapid charging on long journeys. A 22 kW peak charging rate typically adds about 60-70 miles of range per hour of charging, depending on the vehicle's capabilities. Plan accordingly for longer stays if you need a substantial charge. Its slower speed means it's not ideal for drivers needing to quickly add a large amount of range.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Hauptstraße 10.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB