chargevu
0 of 1 available3.7 kW peakIndependent

Joe Machens Capital City Ford

807 Southwest Blvd, Jefferson City, US

1 port

Ports at this station

  • Type 1 (J1772)

    1× · up to 3.7 kW

    Unknown

Station info

Address
807 Southwest Blvd, 65109, Jefferson City, MO, United States
Access
Dealership business hours; Dealership permission required
Coordinates
38.57869, -92.19979
Last verified
2025-11-11

About this stop

This independent EV charging site at Joe Machens Capital City Ford in Jefferson City offers charging for electric vehicles. It provides 4 kW peak charging, which is slower AC power. The connectors available on site are Type 1 (J1772). The station is currently reported as operational, supporting EV charging in Jefferson City.

A 4 kW peak charging speed means you will add about 15-20 miles of range per hour. This is best suited for topping up your car while you are at the dealership or for local driving needs. For longer journeys, consider stations with faster DC charging. This station is not designed for quick turnarounds on road trips; it offers a steady, slower charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Joe Machens Capital City Ford.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Joe Machens Capital City Ford.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB