chargevu
2 of 2 available22 kW peakStromnetz Hamburg

Lütjenmoor 15

Lütjenmoor 15, Norderstedt, DE

2 ports

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available

Station info

Address
Lütjenmoor 15, 22850, Norderstedt, Germany
Coordinates
53.68578, 9.98838
Last verified
2021-07-09

About this stop

This AC charger at Lütjenmoor 15 is a good option for drivers needing a slower charge in Norderstedt. Stromnetz Hamburg runs the station, which offers CEE 7/4 (Schuko) Type F connectors. Peak power reaches 22 kW.

Expect about 22 kW charging speeds here. This means you might add roughly 100 miles of range to a compatible EV in 4 hours, depending on the car. It is best suited for local top-ups or longer stops rather than rapid road-trip charging. EV charging in Norderstedt includes options like this for everyday needs.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Lütjenmoor 15.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Lütjenmoor 15.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB