chargevu
0 of 2 available3.7 kW peakChargePoint

METRO CENTER 989 E HLDSLE 2

Portal Ln, Foster City, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
Portal Ln, 94404, Foster City, CA, United States
Access
24 hours daily
Coordinates
37.55767, -122.27375
Last verified
2025-11-11

About this stop

This ChargePoint station at METRO CENTER 989 E HLDSLE 2 in Foster City offers 4 kW peak AC charging. It provides Type 1 (J1772) connectors. This speed is best suited for drivers needing a steady charge rather than a rapid refill. It is one option for EV charging in Foster City.

At 4 kW peak, expect to add about 10 to 12 miles of range per hour of charging. This makes it practical for topping up while parked for a few hours, perhaps during work or a longer shopping trip. It is not ideal for quick top-ups or long-distance road trips where faster charging is needed. The station is reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at METRO CENTER 989 E HLDSLE 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of METRO CENTER 989 E HLDSLE 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB