chargevu
0 of 8 available3 kW peakChargePoint

MOUNTAIN GROVE

27651 San Bernardino Ave, Redlands, US

8 ports

Ports at this station

  • Type 1 (J1772)

    8× · up to 3 kW

    Unknown

Station info

Address
27651 San Bernardino Ave, 92374, Redlands, CA, United States
Access
24 hours daily
Coordinates
34.07431, -117.20320
Last verified
2019-12-24

About this stop

Mountain Grove is an EV charging station located in Redlands, US. It is operated by ChargePoint and provides Type 1 (J1772) connectors. The station has an unstated number of charging points, and its current operational status is unknown. Peak power output is limited to 3 kW, classifying it as a slower AC charging option. This power level means adding about 10-15 miles of range per hour of charging. For drivers needing a substantial energy boost for long journeys, this station is better suited for local top-ups or as a secondary charging point rather than a primary destination for rapid replenishment. EV charging in Redlands can be found at this location, but drivers should verify its operational status before arrival.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at MOUNTAIN GROVE.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of MOUNTAIN GROVE.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB