MPNEXT - Davenia Alimentari
Via della Resistenza 48, Buccinasco, IT
2 ports · 0.55 €
Ports at this station
- Available
Type 2
2× · up to 22 kW
Station info
- Address
- Via della Resistenza 48, 20090, Buccinasco, MI, Italy
- Total points
- 1
- Coordinates
- 45.41515, 9.11567
- Last verified
- 2023-12-03
About this stop
This station at MPNEXT - Davenia Alimentari in Buccinasco offers EV charging via one Type 2 socket. It provides a peak power of 22 kW, which is slower AC charging. ZapGrid operates this site.
This 22 kW charger is best for local top-ups or longer stops rather than quick road trip charges. At 22 kW, a typical EV might regain about 12-15 miles of range per hour of charging. Charging here costs 0.55 € per kWh. This is one option for EV charging in Buccinasco.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
Lacchiarella Parcheggio Comunale | EnelX
10.7 kmLacchiarella
22 kW
Casorate Primo (Tigros)
13.6 kmCasorate Primo
22 kW
Bereguardo ("La Pesa")
18.8 kmBereguardo (PV)
22 kW
EnelX EVA+ Trivolzio
18.8 kmTrivolzio
50 kW
ASC - Pista di Vairano
19.1 kmVidigulfo
power n/a
Ristorante Cascine Orsine Bereguardo BeCharge
20.1 kmBereguardo
22 kW
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of MPNEXT - Davenia Alimentari.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB