chargevu
0 of 2 available3 kW peakChargePoint

NATIONAL GRID

54 Crossing Blvd, Clifton Park, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3 kW

    Unknown

Station info

Address
54 Crossing Blvd, 12065, Clifton Park, NY, United States
Access
24 hours daily
Coordinates
42.86094, -73.77129
Last verified
2019-12-24

About this stop

This NATIONAL GRID charging station in Clifton Park, US, is part of the ChargePoint network. It offers 3 kW peak AC charging, best suited for drivers needing a local top-up rather than a rapid charge. The station provides Type 1 (J1772) connectors. The reported status of the charging points is unknown.

At 3 kW peak, this is a slower AC charging option. Expect to add roughly 10-15 miles of range per hour, depending on your EV. This makes it a practical choice for EV charging in Clifton Park when you have time to spare, like during a shopping trip or an overnight stay, rather than for quick road trip stops. It is not designed for rapid replenishment of your battery.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at NATIONAL GRID.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of NATIONAL GRID.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB