chargevu
0 of 2 available3 kW peakChargePoint

NEW

1055 E Jericho Turnpike, Huntington, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3 kW

    Unknown

Station info

Address
1055 E Jericho Turnpike, 11743, Huntington, NY, United States
Access
24 hours daily
Coordinates
40.83554, -73.36980
Last verified
2019-12-24

About this stop

This ChargePoint station at NEW in Huntington, US, provides Type 1 (J1772) connectors. These fit most electric vehicles. The station offers a peak power of 3 kW.

EV charging in Huntington at this location delivers slower AC power. A 3 kW peak means you might add about 10 to 15 miles of range per hour of charging. This makes NEW a practical stop for topping up your battery while running errands or spending time locally, rather than a quick charge for long-distance travel. The reported status of the charging points is currently unknown.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at NEW.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of NEW.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB