chargevu
0 of 2 available3.7 kW peakChargePoint

NEXTGEN COOPER ST1

1450 S Cooper Rd, Chandler, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
1450 S Cooper Rd, 85286, Chandler, AZ, United States
Access
24 hours daily
Coordinates
33.28479, -111.80786
Last verified
2025-11-11

About this stop

This ChargePoint station at NEXTGEN COOPER ST1 in Chandler, US provides Type 1 (J1772) connectors. These fit most electric vehicles. The station operates on the ChargePoint network and is currently reported as operational.

A 4 kW peak power output means this station offers slower AC charging. For context, this is often enough to add about 10-15 miles of range per hour of charging, depending on the vehicle. It is better suited for local top-ups or longer stops rather than quick charges during a road trip. This is one option for EV charging in Chandler.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at NEXTGEN COOPER ST1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of NEXTGEN COOPER ST1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB