Parcheggio lato Miniconf / Giannini
SP 64 di Ortignano Raggiolo, Ortignano, IT
2 ports
Ports at this station
- Unknown
Type 2
2× · up to 22 kW
Station info
- Address
- SP 64 di Ortignano Raggiolo, 52010, Ortignano, Arezzo, Italy
- Total points
- 2
- Coordinates
- 43.68106, 11.75263
- Last verified
- 2024-02-09
About this stop
This POWY charging station has two Type 2 socket connectors for electric vehicles. Located in Ortignano, IT, this site is currently listed as planned for future activation.
EV charging in Ortignano can be slow at this 22 kW peak AC station. To put that in perspective, a fully depleted 60 kWh battery electric car would take about 2.5 to 3 hours to reach 80% charge. This speed makes it more suitable for local top-ups rather than quick road-trip stops.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Parcheggio lato Miniconf / Giannini.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB