Plenitude Municipio
Via Aldo Moro 4, Villanova sull'Arda, IT
2 ports
Ports at this station
- Unknown
Type 2
2× · up to 22 kW
Station info
- Address
- Via Aldo Moro 4, Villanova sull'Arda, PC, Italy
- Total points
- 1
- Coordinates
- 45.02620, 9.99705
- Last verified
- 2025-03-03
About this stop
Plenitude Municipio is an EV charging station in Villanova Sull'arda, Italy. Operated by Be Charge, it offers 22 kW peak AC charging power. The station has one charging point equipped with a Type 2 socket. It is currently operational.
This station is best suited for local top-ups or charging while parked in Villanova Sull'arda for an extended period. A 22 kW peak rate means roughly 70-80 miles of range added per hour of charging, depending on your vehicle. This makes it slower than DC fast chargers but adequate for topping up. EV charging in Villanova Sull'arda includes this Be Charge location for residents and visitors.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
Salsomaggiore Terme Unità | EnelX
24.0 kmSalsomaggiore Terme
22 kW
Bagni di Tabiano | EnelX
24.6 kmSalsomaggiore Terme
22 kW
Bagni di Tabiano Castello | EnelX
24.8 kmSalsomaggiore Terme
22 kW
EnelX Boni e Gavazzi
28.2 kmNoceto
22 kW
EnelX Piazzale dello Sport
28.5 kmNoceto
22 kW
EnelX Alberto Sordi
28.6 kmNoceto
22 kW
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Plenitude Municipio.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB