chargevu
2 of 2 available22 kW peakIndependent

Rohrackerstr 178

Rohrackerstr 178, Stuttgart, DE

2 ports

Ports at this station

  • Type 2

    1× · up to 22 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Rohrackerstr 178, 70329, Stuttgart, Germany
Coordinates
48.75844, 9.23779
Last verified
2021-07-12

About this stop

This independent EV charging station at Rohrackerstr 178 in Stuttgart offers 22 kW peak AC charging. It uses Type 2 connectors. The operator is unlisted. It’s a practical option for EV charging in Stuttgart when you need a slower AC charge.

A 22 kW peak charging speed means you can add about 70 to 80 miles of range per hour of charging. This rate makes it suitable for top-ups while you are parked locally or for drivers who are not in a hurry. It is not the fastest option available for EV drivers but provides essential charging infrastructure.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Rohrackerstr 178.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Rohrackerstr 178.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB