chargevu
0 of 1 available3.7 kW peakChargePoint

RUSHMORE HONDA STATION 2

1632 E Mall Dr, Rapid City, US

1 port

Ports at this station

  • Type 1 (J1772)

    1× · up to 3.7 kW

    Unknown

Station info

Address
1632 E Mall Dr, 57701, Rapid City, SD, United States
Access
Mon: 8:00am-5:00pm; Tue: 8:00am-5:00pm; Wed: 8:00am-5:00pm; Thu: 8:00am-5:00pm; Fri: 8:00am-5:00pm; Sat: 8:00am-5:00pm
Coordinates
44.10455, -103.18367
Last verified
2025-11-11

About this stop

Rushmore Honda Station 2 is an EV charging location in Rapid City, US. Operated by ChargePoint, this station offers AC charging with a peak power of 4 kW. The connectors available on site are Type 1 (J1772). EV charging in Rapid City includes this ChargePoint facility. The station is currently reported as operational.

A 4 kW peak power output means this station is best suited for local top-ups rather than rapid road trip charging. To put it in perspective, charging an EV with a 60 kWh battery at 4 kW would take approximately 15 hours to reach a full charge. Drivers looking for a quick charge may find this station slow. It provides a necessary option for EV owners in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at RUSHMORE HONDA STATION 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of RUSHMORE HONDA STATION 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB

Rushmore Honda Station 2, Rapid City EV Charging · Chargevu