chargevu
0 of 2 available3 kW peakChargePoint

SARASOTA COUNTY

4970 City Hall Blvd, North Port, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3 kW

    Unknown

Station info

Address
4970 City Hall Blvd, 34286, North Port, FL, United States
Access
24 hours daily
Coordinates
27.07531, -82.20511
Last verified
2019-12-24

About this stop

This ChargePoint station in North Port, US, offers EV charging. The site is operational and equipped with Type 1 (J1772) connectors. It delivers up to 3 kW of peak power.

EV charging in North Port at this location is best suited for local top-ups or longer stops rather than quick road trip charging. A 3 kW peak charging speed means adding about 10 to 15 miles of range per hour. For context, a typical EV battery might take 8 to 12 hours or more to fully recharge from empty at this rate. This makes it a good option for overnight charging or when you have several hours to spare.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SARASOTA COUNTY.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SARASOTA COUNTY.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB