Scott County Redevelopment - Scott County Courthouse Square
1 E McClain Ave, Scottsburg, US
2 ports
Ports at this station
- Unknown
Type 1 (J1772)
2× · up to 3.7 kW
Station info
- Address
- 1 E McClain Ave, 47170, Scottsburg, IN, United States
- Access
- 24 hours daily
- Phone
- 888-356-8911
- Website
- flo.com
- Coordinates
- 38.68489, -85.76999
- Last verified
- 2025-11-11
About this stop
Scott County Redevelopment's EV charging station at the Scott County Courthouse Square is located in Scottsburg, US. This site is operated by flo and provides 4 kW peak AC charging power. The station has an unstated number of charging points, all equipped with a Type 1 (J1772) connector. Its status is currently reported as operational.
This 4 kW station is best suited for local EV charging in Scottsburg. A 4 kW charging rate means adding about 12 to 16 miles of range per hour of charging, depending on your vehicle. This makes it a practical option for topping up your battery while visiting the courthouse or running errands downtown, rather than a primary stop for long-distance travel. Consider this a convenient local amenity for EV drivers.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Scott County Redevelopment - Scott County Courthouse Square.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB