chargevu
0 of 4 available3.7 kW peakEV Connect

Southeast Station - Metro North Train Station

4 Independent Way, Brewster, US

4 ports

Ports at this station

  • Type 1 (J1772)

    4× · up to 3.7 kW

    Unknown

Station info

Address
4 Independent Way, 10509, Brewster, NY, United States
Access
24 hours daily
Coordinates
41.41658, -73.62430
Last verified
2025-06-24

About this stop

For EV charging in Brewster, the Southeast Station at Metro North Train Station offers 4 kW peak AC charging. This speed suits drivers who need a local top-up or have a longer stop planned. The station uses Type 1 (J1772) connectors. Currently, this EV Connect station is reported as temporarily unavailable.

A 4 kW peak charging rate means you will add about 12-18 miles of range per hour of charging. This is comparable to a Level 1 charger found in a home garage. It is not ideal for quick road trip stops where DC fast charging is needed. Plan for this to be a station for drivers who can leave their vehicle for several hours, such as while commuting or spending a day in town.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Southeast Station - Metro North Train Station.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Southeast Station - Metro North Train Station.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB