chargevu
8 of 8 available22 kW peakStadtwerke Düsseldorf AG

SWD Ministerium für Wirtschaft

Neusser Straße 25, Unterbilk, Düsseldorf, DE

8 ports

Ports at this station

  • Type 2

    2× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    4× · up to 3.7 kW

    Available
  • Type 2

    2× · up to 11 kW

    Available

Station info

Address
Neusser Straße 25, Unterbilk, 40219, Düsseldorf, Germany
Access
Parkplatz, rund um die Uhr (24/7) nutzbar. Ladekarte über https://www.swd-ag.de/privatkunden/strom/
Total points
4
Coordinates
51.21771, 6.76728
Last verified
2016-12-06

About this stop

This Stadtwerke Düsseldorf AG charging station in Düsseldorf offers 22 kW peak AC charging, best for drivers with time for a slower top-up. Four charging points are available, equipped with CEE 7/4 Schuko and Type 2 connectors. The station is currently operational.

At 22 kW, a full charge can take several hours. This station is more suited for drivers living or working nearby, or those who can park for a longer period to replenish their battery. For example, you might add about 60 to 80 miles of range in two hours, depending on your car. This is one option for EV charging in Düsseldorf when you need a charge but aren't in a rush.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SWD Ministerium für Wirtschaft.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SWD Ministerium für Wirtschaft.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB