chargevu
4 of 4 available22 kW peakStadtwerke Düsseldorf AG

SWD Union Investment, Am Seestern

Am Seestern 3, Lörick, Düsseldorf, DE

4 ports

Ports at this station

  • Type 2

    1× · up to 11 kW

    Available
  • Schuko (CEE 7/4)

    2× · up to 3.7 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Am Seestern 3, Lörick, 40547, Düsseldorf, Germany
Access
Rund um die Uhr (24/7) nutzbar
Total points
2
Coordinates
51.24210, 6.73957
Last verified
2016-01-12

About this stop

Stadtwerke Düsseldorf AG operates this EV charging site at Am Seestern in Düsseldorf. It has two AC charging points, each capable of a 22 kW peak. Connectors available are CEE 7/4 (Schuko) and Type 2 (socket only). The station is currently operational. EV charging in Düsseldorf includes this site with no reported cost.

With a 22 kW peak, this is a slower AC charging option. Expect to add roughly 60-80 miles of range per hour, depending on your vehicle's charging capabilities. This makes it best suited for local top-ups or longer stays where you can leave your car connected for several hours, rather than a quick stop on a long journey.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at SWD Union Investment, Am Seestern.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of SWD Union Investment, Am Seestern.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB