chargevu
0 of 2 available3.7 kW peakViaLynk - Lynkwell

TDC Building 25

626 Tom Miller Road, Plattsburgh, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
626 Tom Miller Road, 12901, Plattsburgh, NY, United States
Access
24 hours daily
Coordinates
44.70444, -73.53546
Last verified
2025-11-11

About this stop

TDC Building 25 is a ViaLynk - Lynkwell charging site in Plattsburgh, US. It offers Type 1 (J1772) connectors and a peak power of 4 kW. The current status is Temporarily Unavailable. This site is part of the growing EV charging in Plattsburgh network.

A 4 kW peak output means charging will be slow. Expect to add about 10 to 15 miles of range per hour. This makes it better suited for local top-ups or longer stays rather than quick road trip stops. Drivers should verify operational status before arriving, as this station is currently reported as unavailable.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at TDC Building 25.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of TDC Building 25.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB