Timberline
27500 E. Timberline Rd, Government Camp, US
6 ports
Ports at this station
- Unknown
Type 1 (J1772)
6× · up to 3.7 kW
Station info
- Address
- 27500 E. Timberline Rd, 97028, Government Camp, OR, United States
- Access
- 24 hours daily
- Phone
- 888-356-8911
- Website
- flo.com
- Coordinates
- 45.33046, -121.70897
- Last verified
- 2025-11-11
About this stop
The Timberline charging station is located in Government Camp, US. It is operated by flo. This station offers 4 kW peak AC charging power and has Type 1 (J1772) connectors. The current status is reported as operational. EV charging in Government Camp is supported by this flo site.
At 4 kW peak, this is a slower AC charging option. For context, a typical Level 2 charger might deliver 7 kW or more. This station is best suited for topping up while you are in the area for a few hours, rather than a rapid charge for a long road trip. Expect to add roughly 10-15 miles of range per hour of charging. This facility has an unstated number of charging points available.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
Mt. Hood Meadows Main Base Parking Lot
3.4 kmMt. Hood
3.7 kW
Government Camp - Ski Bowl West
5.9 kmGovernment Camp
50 kW
Cooper Spur Inn
14.0 kmMount Hood
3.7 kW
Welches - Barlow Trail Roadhouse
18.9 kmWelches
50 kW
The Resort at the Mountain - Tesla Destination
20.0 kmWelches
3.7 kW
The Resort At the Mountain
20.0 kmWelches
10 kW
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Timberline.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB