chargevu
1 of 1 available22 kW peake-space (GE)

Turtle Lake

კუს ტბის აღმართი, ვაკის რაიონი, თბილისი, GE

1 port · 0-5 kW: 0.03₾/min, 5-10 kW: 0.06₾/min, 10-15 kW: 0.11₾/min, 15-22 kW: 0.17₾/min

Ports at this station

  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
კუს ტბის აღმართი, ვაკის რაიონი, 1062, თბილისი, Georgia
Total points
1
Coordinates
41.70912, 44.74151
Last verified
2023-03-19

About this stop

e-space operates the Turtle Lake site in Tbilisi. It offers one charging point with a Type 2 connector. The station delivers a peak power of 22 kW, which is slower AC charging. This is one option for EV charging in Tbilisi.

For practical purposes, 22 kW means a full charge can take several hours, making it better suited for local top-ups rather than quick road-trip stops. Drivers pay by the minute, with rates increasing with charging speed. Expect to pay 0.03₾ per minute for 0-5 kW, 0.06₾ for 5-10 kW, 0.11₾ for 10-15 kW, and 0.17₾ for 15-22 kW. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Turtle Lake.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Turtle Lake.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB