ULSTER COUNTY
1 Development Court, Kingston, US
6 ports
Ports at this station
- Unknown
Type 1 (J1772)
6× · up to 3 kW
Station info
- Address
- 1 Development Court, 12401, Kingston, NY, United States
- Access
- 24 hours daily
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 41.94722, -73.99502
- Last verified
- 2019-12-24
About this stop
This ChargePoint station in Kingston, US, uses Type 1 (J1772) connectors, compatible with most electric vehicles. The station is reported as operational. It provides 3 kW peak power, which is a Level 2 AC charging speed. This is suitable for topping up your EV battery while you are in the area. EV charging in Kingston is available at this site.
At 3 kW peak, you can expect to add about 10 to 12 miles of range per hour of charging. This is slower than DC fast charging, making it a good option for local drivers or for those who have time to spare while parked. Plan for longer charging sessions compared to higher-power stations. This is a practical stop for consistent EV ownership in the region.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of ULSTER COUNTY.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB