chargevu
0 of 6 available3 kW peakChargePoint

ULSTER COUNTY

1 Development Court, Kingston, US

6 ports

Ports at this station

  • Type 1 (J1772)

    6× · up to 3 kW

    Unknown

Station info

Address
1 Development Court, 12401, Kingston, NY, United States
Access
24 hours daily
Coordinates
41.94722, -73.99502
Last verified
2019-12-24

About this stop

This ChargePoint station in Kingston, US, uses Type 1 (J1772) connectors, compatible with most electric vehicles. The station is reported as operational. It provides 3 kW peak power, which is a Level 2 AC charging speed. This is suitable for topping up your EV battery while you are in the area. EV charging in Kingston is available at this site.

At 3 kW peak, you can expect to add about 10 to 12 miles of range per hour of charging. This is slower than DC fast charging, making it a good option for local drivers or for those who have time to spare while parked. Plan for longer charging sessions compared to higher-power stations. This is a practical stop for consistent EV ownership in the region.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at ULSTER COUNTY.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of ULSTER COUNTY.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB