VOG EV STATION VOG EV STATION
960 Main St, Grafton, US
2 ports
Ports at this station
- Unknown
Type 1 (J1772)
2× · up to 3.7 kW
Station info
- Address
- 960 Main St, 44044, Grafton, OH, United States
- Access
- 24 hours daily
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 41.27352, -82.05500
- Last verified
- 2025-11-11
About this stop
This ChargePoint station at VOG EV STATION VOG EV STATION in Grafton offers 4 kW peak AC charging. It uses Type 1 (J1772) connectors. This speed is best for drivers who have time to charge while parked, such as during shopping trips or at work. EV charging in Grafton is expanding, and this site adds another option.
Expect a slow charge here. 4 kW peak power means adding about 12-15 miles of range per hour, depending on your vehicle. This is not a fast DC charger for a quick road trip stop. Consider this site for a local top-up or when you can leave your EV plugged in for several hours. The station is reported as operational.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of VOG EV STATION VOG EV STATION.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB