chargevu
0 of 2 available3.7 kW peakIndependent

Watkins Glen State Park Parking

971 N Franklin St, Watkins Glen, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
971 N Franklin St, 14891, Watkins Glen, NY, United States
Access
24 hours daily; seasonal parking fee Public - Credit card at all times
Coordinates
42.37598, -76.87081
Last verified
2025-11-11

About this stop

This station uses a Type 1 (J1772) connector, compatible with most North American EVs. The station at Watkins Glen State Park Parking is independently operated and offers 4 kW peak AC charging. There is an unstated number of charging points available on site, and the current status is reported as operational.

At 4 kW peak, this charger is best suited for topping up your battery while visiting the park or for local EV charging in Watkins Glen. Expect to add about 12 to 16 miles of range per hour of charging. This rate is considerably slower than DC fast chargers. Plan accordingly for longer stays or overnight charging if needed.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Watkins Glen State Park Parking.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Watkins Glen State Park Parking.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB