chargevu
2 of 2 available22 kW peakEnBW (D)

Wehrstr. 6

Wehrstr. 6, Wendlingen, DE

2 ports

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available

Station info

Address
Wehrstr. 6, 73240, Wendlingen, Germany
Coordinates
48.67018, 9.39279
Last verified
2021-07-09

About this stop

This EnBW station at Wehrstr. 6 in Wendlingen offers 22 kW peak AC charging. It uses CEE 7/4 - Schuko - Type F connectors, suitable for drivers who need a moderate charge rather than rapid DC speeds. The exact number of charging points is not specified.

A 22 kW peak charging speed means it takes roughly 3 to 4 hours to add about 100 miles of range for many EVs. This makes it a good option for local top-ups or longer stops in Wendlingen, rather than a quick charge on a long road trip. Station status is currently unknown.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Wehrstr. 6.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Wehrstr. 6.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB