Ports at this station
- Available
Schuko (CEE 7/4)
1× · up to 22 kW
- Available
Type 2
1× · up to 22 kW
- Available
Schuko (CEE 7/4)
1× · up to 22 kW
- Available
Type 2
1× · up to 22 kW
Station info
- Address
- Westende 3, 68723, Plankstadt, Germany
- Coordinates
- 49.39331, 8.58207
- Last verified
- 2021-07-12
About this stop
For drivers needing slower AC charging, Westende 3 in Plankstadt, Germany, operated by EnBW, offers 22 kW peak power. The station provides CEE 7/4 Schuko and Type 2 sockets. The exact number of charging points is not specified.
At 22 kW, this is a station best suited for local top-ups rather than rapid highway charging. Expect to add roughly 50-70 miles of range per hour of charging, depending on your vehicle's capabilities. This makes it a practical stop for residents or visitors needing to recharge while parked for an extended period in Plankstadt.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Westende 3.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB