chargevu
0 of 2 available3.7 kW peakIndependent

Wright State University - Lot 10

3460 Colonel Glenn Hwy, Dayton, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
3460 Colonel Glenn Hwy, 45435, Dayton, OH, United States
Access
24 hours daily; permit required
Coordinates
39.78426, -84.06338
Last verified
2025-11-11

About this stop

If you need a slow AC charge, Wright State University's Lot 10 station in Dayton offers 4 kW peak power. It uses Type 1 (J1772) connectors. The operator is independent or unlisted. This station is part of EV charging in Dayton.

A 4 kW peak charging speed means you will add about 10 to 15 miles of range per hour. This is best for drivers who can leave their car for several hours, perhaps while attending classes or working on campus. It is not ideal for quick top-ups when you are in a hurry. The number of charging points is not specified. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Wright State University - Lot 10.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Wright State University - Lot 10.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB