chargevu
2 of 2 available22 kW peakEnBW (D)

Zum Turnerheim 27

Zum Turnerheim 27, Bartholomä, DE

2 ports

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available

Station info

Address
Zum Turnerheim 27, 73566, Bartholomä, Germany
Coordinates
48.75862, 9.98450
Last verified
2021-07-09

About this stop

This EnBW charging station at Zum Turnerheim 27 in Bartholomä offers slower AC charging. It provides 22 kW peak power and uses Type F connectors, also known as Schuko. This speed is best for drivers who need to top up their battery while parked for a longer period, not for quick road-trip charging. The station is part of the EV charging in Bartholomä network.

A 22 kW peak charging rate means you might add about 40-60 miles of range per hour, depending on your EV model. This makes it a good option for local use or for charging during a lengthy stop, such as overnight or during a long workday. It is not designed for rapid charging needs.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Zum Turnerheim 27.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Zum Turnerheim 27.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB