EV charging in Nittenau
Germany
Nittenau has 4 public EV charging stations: 1 fast (50 kW and up). The largest networks are E-Wald (1), Lidl (1).
Data: Open Charge Map contributors and Chargevu drivers · checked · last listing change
Tap any marker for power, status and directions. The view updates as you move.
Station missing? Add itBrowse by country →Pan or zoom the map to load every charger in view.
4
Stations
1
Fast (≥50 kW)
0
Ultra (≥150 kW)
2
Operators
Fast chargers in Nittenau
1 station doing at least 50 kW on DC.
≥ 150 kWUltra-rapid in Nittenau
0 sites at 150 kW or higher.
no feeFree charging in Nittenau
Stations that list zero cost. Confirm at the station, prices move.
citiesOther cities in Germany
Every town in Germany with a charger, by station count.
countryAll charging in Germany
Back to the country overview with every city, network, and connector.
Plug in around Nittenau
4 sites, sorted by peak power. Page 1 of 1.
Lidl
50 kWLidl · Free for costumers for one hour
Jahnweg 22
22 kWE-Wald
Böhmerwaldstraße 2
22 kWIndependent
E-Bike-Ladestation
2 kWIndependent · Free of charge
Narrow it down by fast or ultra-rapid, or pan the live map.
Network share in Nittenau
Share of the 4 stations in Nittenau. Independent and uncategorised sites are left out.