chargevu
4 of 4 available2.3 kW peakIndependent

E-Bike-Ladestation

Marktplatz, Nittenau, DE

4 ports · Free of charge

Ports at this station

  • Schuko (CEE 7/4)

    4× · up to 2.3 kW

    Available

Station info

Address
Marktplatz, 93149, Nittenau, Free State of Bavaria, Germany
Access
Green bike rack with 2 blue Schuko sockets on each side.
Total points
4
Coordinates
49.19753, 12.27168
Last verified
2021-06-13

About this stop

For EV drivers needing a slow AC charge in Nittenau, the E-Bike-Ladestation has four points ready. This independent charging site offers a peak output of 2 kW, using standard Type F (Schuko) connectors. The station is currently reported as operational and charges for free.

A 2 kW charging speed means you will add roughly 6 to 8 miles of range per hour of charging. This rate is best suited for topping up your battery while parked locally or for drivers who are not in a rush. It is not ideal for rapid replenishment during long road trips where faster charging is typically needed. This is one option for EV charging in Nittenau.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at E-Bike-Ladestation.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of E-Bike-Ladestation.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB