≥ 150 kW DC18 stations
Ultra-rapid charging in Slovenia
Sites in Slovenia with at least one 150 kW socket. Plan a road trip around these — they recover the most range per minute.
Sites in Slovenia with at least one 150 kW socket. Plan a road trip around these — they recover the most range per minute.