chargevu
4 of 4 available150 kW peakBP Pulse (US)

ARCO, Cascade Blvd, CA

2402 Cascade Blvd, Redding, US

4 ports

Ports at this station

  • CCS1

    4× · up to 150 kW

    Available

Station info

Address
2402 Cascade Blvd, 96003, Redding, CA, United States
Access
24 hours daily
Total points
4
Coordinates
40.64239, -122.36772
Last verified
2026-02-24

About this stop

For drivers needing a rapid EV charge in Redding, the ARCO station on Cascade Boulevard offers 150 kW peak power. BP Pulse operates four charging points here, all equipped with CCS Type 1 connectors. The station is currently reported as operational.

This is an ultra-rapid charging site. A 150 kW peak means you could add approximately 100 miles of range in about 20 minutes, depending on your vehicle's charging speed and battery level. It suits drivers needing a quick top-up during local errands or those on longer journeys who require fast charging. It is one option for EV charging in Redding.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at ARCO, Cascade Blvd, CA.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of ARCO, Cascade Blvd, CA.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB