chargevu
0 of 2 available3.7 kW peakChargePoint

ASPEN BLOOMINGT 4

703 West Gourley Pike, Bloomington, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
703 West Gourley Pike, 47404, Bloomington, IN, United States
Access
24 hours daily
Coordinates
39.18409, -86.54132
Last verified
2025-06-24

About this stop

This ChargePoint station in Bloomington, US uses Type 1 (J1772) connectors, suitable for most electric cars sold in North America. It is currently operational and part of the ChargePoint network. The station offers 4 kW peak charging, which is a slower AC charging speed. This is typical for charging while parked for a few hours, like during work or shopping. It adds to the available EV charging in Bloomington, providing another option for local drivers. The charging speed means you might add about 12-20 miles of range per hour of charging, depending on your vehicle's efficiency. Plan accordingly if you need a quick charge. This station is best suited for topping up your battery during a longer stop rather than a rapid refueling on a long road trip. Consider it for everyday use around town or while visiting local attractions.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at ASPEN BLOOMINGT 4.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of ASPEN BLOOMINGT 4.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB